Photos

Keyword: Category: Tag: Sort By:
Jeremy McBay (right), MGC Roofing and Construction, guides the roof panels to the stack in the parking lot of the 919th Special Operations Wing headquarters building Sept. 4 at Duke Field.  The workers off-loaded approximately 1,000 panels to be cut and shaped before they are used to cover the headquarters building.  (U.S. Air Force photo/Staff Sgt. Samuel King Jr.)


Raising the roof

Jeremy McBay (right), MGC Roofing and Construction, guides the roof panels to the stack in the parking lot of the 919th Special Operations Wing headquarters building Sept. 4 at Duke Field. The workers off-loaded approximately 1,000 panels to be cut and shaped before they are used to cover the headquarters building. (U.S. Air Force photo/Staff Sgt. Samuel King Jr.)

Related Imagery