U.S. Air Force Brig. Gen. William Holt, special assistant to the commander of Air Force Special Operations Command, taxis a U-28A Draco down the Hurlburt Field flightline during his “Fini” flight at Hurlburt Field, Florida, July 19, 2019. Holt has flown the U-28A for 12 years and has accrued approximately 700 flight hours in his 28 years of service in Air Force. (U.S. Air Force photo by Senior Airman Dennis Spain)

Photos

Image Gallery

Keyword:
Category:
Tag:
Sort By:
Construction workers create a path for electrical cables Sept. 19 at Eglin Air Force Base, Florida.  The electrical cables will connect to the DOD’s first ever electric aircraft charging station.  (U.S. Air Force photo/Samuel King Jr.)


Duke Field breaks ground on first electric aircraft charging station

Utility workers create a path for electrical cables that will connect to the first electric aircraft charging station on a military installation at Duke Field, Florida, Sept. 19, 2023. The expected completion date for the Level 3 direct current electric vehicle fast charging station construction project is Oct. 13, 2023, weeks before BETA’s electric vertical take-off and landing aircraft arrives for testing. (U.S. Air Force photo/Samuel King Jr.)

Related Imagery
Samuel King Jr.
230919-F-OC707-0001.JPG

DOWNLOAD PHOTO
(1.68 MB)



Tags




< Back to Main Gallery